Inside A Shark

Pictured is the very first stage of the new SWP (Saltwater Punt). Everybody says that their boats are heavy duty, if so they should look like this! 6 pressings, 11 floor ribs double in both the rear and foward impact zones, internal keel 50mm high 6mm thick and the ribs at chine end are squashed not spread. Remember this is only stage 1.
Tabs Tough Tinnies
